Billable Work Tracking Automation

Every issue that arrives automatically logs to your billing sheet. No more hunting for unbilled work at month-end or losing track of client projects.

Trigger

New Issue

Fires when a new issue is created in the Jira project you configure. Only issues created in that project produce an event.

Google Sheets logo

Action

Batch update spreadsheet

Updates a specified range in a google sheet with given values, or appends them as new rows if `first cell location` is omitted; ensure the target sheet exists and the spreadsheet contains at least one worksheet.

Why this helps

You undercharge because you forget to log billable work. Month-end invoicing requires digging through Jira to find what was actually completed. Revenue visibility suffers.

  • Never lose track of billable hours or work
  • Accurate month-end invoicing
  • Transparent revenue per client
  • Simpler financial forecasting

Setup

Build it in a few focused steps.

  • 1Connect Jira and Google Sheets to Notis
  • 2Create an automation: 'Log each new issue to my billing sheet with client, project, and date'
  • 3Select the trigger: New Issue from your Jira project
  • 4Notis appends rows to your billing sheet with issue details
  • 5Configure to extract client and project info from Jira fields or issue naming
  • 6Test by creating an issue for a real client

Questions about this workflow

Does this handle billable vs. non-billable issues?

Yes. Specify in your prompt which issues to log: 'Only log issues tagged as billable' or 'Log all except internal projects.'

Can I track time in Sheets instead of Jira?

Yes. Notis can append with an empty time field for you to fill in, or integrate with time-tracking data if available in Jira custom fields.

How do I handle client billing rates?

Store rates in a reference sheet and Notis can calculate billable value automatically: 'Multiply hours by the rate in the Rates sheet.'

When this happens · Trigger

Do this · Action

Supported Triggers and Actions

Notis builds workflows that link Jira to Google Sheets. A trigger fires from one place; an action lands in another.

Jira logo

Jira triggers

Google Sheets logo

Google Sheets actions

New Issue

Fires when a new issue is created in the Jira project you configure. Only issues created in that project produce an event.

TriggerInstant

Add Sheet to Spreadsheet

Adds a new sheet (worksheet) to a spreadsheet. use this tool to create a new tab within an existing google sheet, optionally specifying its title, index, size, and other properties.

ActionInstant

New Project

Triggered when a new project is added in Jira

TriggerInstant

Aggregate Column Data

Searches for rows where a specific column matches a value and performs mathematical operations on data from another column.

ActionInstant

Updated Issue

Fires when an existing issue is changed in the Jira project you configure — for example its status, assignee, or any other field on the issue is updated. Only issues in that project produce an event. It does not fire on comment activity: adding, editing, or deleting a comment on an issue will not produce an event from this trigger.

TriggerInstant

Append Dimension

Tool to append new rows or columns to a sheet, increasing its size. use when you need to add empty rows or columns to an existing sheet.

ActionInstant

Batch get spreadsheet

Retrieves data from specified cell ranges in a google spreadsheet; ensure the spreadsheet has at least one worksheet and any explicitly referenced sheet names in ranges exist.

ActionInstant

Batch update spreadsheet

Updates a specified range in a google sheet with given values, or appends them as new rows if `first cell location` is omitted; ensure the target sheet exists and the spreadsheet contains at least one worksheet.

ActionInstant

Batch Update Values by Data Filter

Tool to update values in ranges matching data filters. use when you need to update specific data in a google sheet based on criteria rather than fixed cell ranges.

ActionInstant

Clear Basic Filter

Tool to clear the basic filter from a sheet. use when you need to remove an existing basic filter from a specific sheet within a google spreadsheet.

ActionInstant

Clear spreadsheet values

Clears cell content (preserving formatting and notes) from a specified a1 notation range in a google spreadsheet; the range must correspond to an existing sheet and cells.

ActionInstant

Connect any two apps with Notis in the middle.

Not just Jira and Google Sheets. Any combination from 985+ integrations.

When this happens · Trigger

Do this · Action

Save your first hour today.

7 days free trial with 20$ free usage included.
No card. Works with personal or business Google Sheets.